- Automation & ControlView all 2,895 products
- Automation Accessories
- AC Drives
- PLC & I/O Cards
- Industrial Communications
- Vibration Monitoring
- Controllers & Data Acquisition
- Isolator & Barrier
- Safety Switches & Guard Locking
- Motor Soft Starters
- CCTV & Security
- Encoders
- Pneumatic Cylinders
- HMI Displays
- Servo Drives
- Industrial Computers
- Machine Vision
- Automation Software
- Robotics
Brand: GESTRA
GESTRA BW 31 Calorimat Return-Temperature Control Valve PN 40
Description
GESTRA BW 31 Calorimat Return-Temperature Control Valve: overview
The GESTRA BW 31 is a Calorimat return-temperature control valve for industrial heating systems. It regulates demand-based consumption by increasing the flow in the return line when the temperature of the fluid falls. A Thermovit regulator and spring pressure control the orifice, and the closing temperature is factory-set and adjustable within the listed range. The GESTRA BW 31 is for hot water and the BW 31A is for heating oil.
Seven Star LLC is an independent supplier serving Oman and the GCC and is not affiliated with the manufacturer. We list the BW 31 for buyers who need an exact GESTRA type for a repair, a replacement or a new project and want a clear technical summary before they ask for a quotation. Everything below is condensed from the manufacturer datasheet, so you can compare the BW 31 with the line conditions on your own drawings. Where a value is not stated in the datasheet, we leave it out rather than guess.
GESTRA equipment is common on steam and condensate systems, boiler houses and process plants, and many installed units in Omani and Gulf facilities are now several years old. That is why buyers often search by the exact type designation such as BW 31. Matching the designation, nominal size, pressure rating and connection type is the surest way to get the right replacement, and our team can help check these details against the nameplate or the earlier project documentation before a quotation is issued.
Key features of the BW 31
The datasheet describes the following points about the BW 31. They explain why this return-temperature control valve is chosen for its duty and what to look for when comparing it with other options.
- Thermovit regulator operates the flow orifice without external energy.
- The orifice always stays slightly open, producing a minimal bleed flow.
- Closing temperature factory-set in 5 degree steps, optionally adjustable externally.
- Optional controller SL for reduced bleed flow.
- Installation in any position, ideally in a horizontal line.
- Body and cover in 1.0460 / SA105.
Technical specifications of the BW 31
The table below summarises the main data for the BW 31 taken from the manufacturer datasheet. Always confirm the final pressure and temperature limits against the datasheet for the exact version and connection you plan to order, because ratings depend on connection type and size.
| Parameter | Value |
|---|---|
| Nominal sizes | DN 15, 20, 25 at PN 40 / Class 150, DN 40 at PN 25 / Class 150 |
| Max. differential pressure | 6 bar |
| BW 31 closing temperature | 20 to 130 C (DN 15), 20 to 115 C (DN 20), 20 to 110 C (DN 25) |
| BW 31A closing temperature | 120 to 270 C and 100 to 280 C depending on size |
| Service pressure PN 40 | 40.0 bar at -10/20 C, 23.8 bar at 400 C |
| Class 150 | 19.6 bar at -29/38 C, 6.5 bar at 400 C |
| Body and cover | 1.0460 / SA105 |
| Bolts | 1.7225 / A193 B7 |
| Gasket | Graphite/CrNi |
| Connections | Flanges, screwed G or NPT, socket-weld, butt-weld |
Typical applications in Oman and the GCC
The BW 31 is a return-temperature control valve, and the following use cases show where a unit of this kind is typically applied across oil and gas, utilities, water and manufacturing in Oman and the wider GCC. They are examples based on the described function and not a guarantee of suitability, so the actual operating data should always be checked.
- Return lines of hot water and heating-oil systems at refineries and process plants use it to avoid wasteful flow.
- Utilities and district heating lines in the GCC use the valve to limit return temperatures and heat loss.
- Manufacturing plants with heating coils and tracing use it to keep flows matched to demand.
Selection and compatibility notes
Selecting the BW 31 correctly starts with the process data. Collect the operating pressure, the maximum and minimum temperature, the fluid, the flowrate and the connection standard of the existing pipework, then compare them with the datasheet. The notes below summarise the main decision points for this model.
- Use BW 31 for hot water and BW 31A for heating oil.
- Specify the closing temperature when ordering, or choose an external adjusting device.
- Install in the return line observing the arrow.
Installation and commissioning of the BW 31
Before installing the BW 31, flush the line to remove weld spatter, scale and construction debris, because even a robust return-temperature control valve can be damaged or held open by foreign particles. Check that the flow direction arrow or the marked inlet on the BW 31 matches the piping, and confirm that the nameplate type, size and pressure rating agree with the purchase documents.
Support the pipework so that no piping stress is transferred to the body of the BW 31. Use new gaskets of a type suitable for the fluid and temperature, tighten flange or union bolts evenly and in a cross pattern, and follow the instructions in the manufacturer installation and operating manual for the exact model. If the equipment is used in a potentially explosive area, the plant operator remains responsible for zoning and for preventing static charge, as the datasheet explains for GESTRA equipment.
During commissioning, bring the system up gradually. Open isolation valves slowly, vent trapped air where the design allows, and observe the BW 31 during the first warm-up for leaks at joints and for unusual noise or vibration. Record the first operating pressure and temperature so that later inspections have a reference.
Maintenance and service
The regulator is always immersed, so check for scale or deposits.
The bleed flow is intentional; do not treat it as a leak.
A short routine inspection plan helps the BW 31 last longer. Note the date of installation, the service conditions and any events such as water hammer or overpressure. At each planned shutdown, inspect the visible joints, check for external corrosion or leakage and compare performance against the commissioning record. Only use spare parts and gaskets that suit the exact type and rating of the BW 31, and isolate and depressurise the line fully before any work is started.
Related products and ordering notes
Orders for the BW 31 should state the type designation, nominal size, pressure rating, end connection standard, material or version and the quantity required. If you are replacing an existing unit, add the nameplate data and a photograph of the nameplate when possible. The manufacturer family also includes other steam, condensate and flow control products, and we can quote related items together with the BW 31 when you send a combined enquiry. Seven Star LLC does not publish prices on this page, so each enquiry is answered with a written quotation.
Frequently asked questions
What does the BW 31 regulate? The flow in the return line, depending on the fluid temperature.
Which fluid is it for? BW 31 for hot water and BW 31A for heating oil.
Is the closing temperature adjustable? Yes, it is factory-set and can be changed within the listed range, optionally with an external adjusting device.
What is the maximum differential pressure? 6 bar. Please confirm against the manufacturer datasheet.
What sizes are available? DN 15, 20 and 25 at PN 40 / Class 150 and DN 40 at PN 25 / Class 150.
Documents and quotation
The manufacturer datasheet for the BW 31 is attached to this page as a PDF so you can verify every value above and share it with your engineering team. To receive a quotation, send an RFQ that includes the part number BW 31, the nominal size, the pressure rating and connection type, and the quantity you need. Our team in Muscat will confirm availability and lead time and reply with a written offer for delivery to Oman and the GCC.
Datasheets & Documents
- Datasheet GESTRA BW 31 Calorimat Return-Temperature Control Valve PN 4 Datasheet Download
Reviews (0)
How would you rate this product? Cancel reply
About brand
GESTRA is the German steam and condensate specialist behind the UNA ball float steam traps, the MPA blowdown valves and a long line of boiler level and conductivity controls. It was founded in Bremen in 1902 by Gustav F. Gerdts, and has been part of Spirax Sarco since 2017.
Seven Star LLC is an independent supplier in Muscat. We list GESTRA steam traps, blowdown valves and boiler control equipment, and supply GESTRA parts and spares to boiler houses and process plants in Oman and the GCC.
GESTRA company profile
| Established | 29 October 1902, Bremen, Germany, by Gustav Friedrich Gerdts; renamed Gustav F. Gerdts KG in 1907 |
|---|---|
| Ownership history | Became a stock corporation (GESTRA AG) in 1987, was taken over by Flowserve in 2002, and has been part of the Spirax Sarco group since 2017 |
| Product families | Steam traps, non-return and check valves, boiler blowdown valves, control valves, and boiler control electronics for level, conductivity and temperature |
| Applications | Steam boilers, steam distribution and condensate return in process plants, power stations, hospitals, food and textile plants |
Milestones
- 1902: Gustav Friedrich Gerdts founds the company in Bremen on 29 October.
- 1907: The company is renamed Gustav F. Gerdts KG.
- 1987: It becomes a stock corporation, GESTRA AG.
- 2002: Flowserve takes over GESTRA.
- 2017: GESTRA becomes part of the Spirax Sarco group.
GESTRA products we list
| Series | Type | What it does |
|---|---|---|
| UNA 45, UNA 16, UNA 38 | Ball float steam traps | Continuous condensate discharge from heat exchangers and process equipment; the UNA 38 is the high-pressure version (PN 100) |
| BK 45 | Bimetallic steam trap | Robust trap for steam main drainage and tracing, resistant to water hammer |
| MK 45, TK 23, SMK 22-81 | Thermostatic steam traps | Air venting and condensate discharge; the SMK 22-81 is the sanitary version for clean steam |
| MPA 46 | Rapid-action blowdown valve | Short, intermittent bottom blowdown that removes sludge from the boiler |
| NRS 1-54, NRR 2-50, NRR 2-60, NRGT 26-2 | Boiler level controls | Water level limiting, feedwater control and continuous level measurement |
| LRGT 16-1, LRR 1-50 | Conductivity measurement and control | Keeps boiler water conductivity in range through continuous blowdown |
| TRS 5-50 | Safety temperature limiter | SIL 3 temperature limiting for boilers and hot water systems |
The type of steam trap follows the duty. Ball float traps discharge condensate as soon as it forms, which suits heat exchangers with changing loads. Thermostatic and bimetallic traps hold condensate back slightly and suit steam mains, tracing and air venting. On the boiler itself, GESTRA level and conductivity electronics work as a system: electrodes or transmitters in the boiler, controllers in the panel, and the feedwater and blowdown valves they drive.
Where GESTRA products are used
In Oman and the GCC, GESTRA equipment is used in boiler houses of refineries, petrochemical and fertiliser plants, power and desalination stations, food and beverage plants, laundries, hotels and hospitals.
Ordering GESTRA parts: what we need
Send the type designation, pressure rating (PN) and connection size (DN), the end connection (flanged, screwed or socket weld), the operating pressure and condensate load for steam traps, and the supply voltage and bus type (CAN bus, 4-20 mA) for control equipment. For electrodes, add the insertion length.
Facts checked against GESTRA company history and Bremen city records, October 2026.
Browse GESTRA products by category: Liquid Analysis Sensors.
FAQ
Questions about the GESTRA BW 31 Calorimat Return-Temperature Control
Answers from our engineering team on installation, compatibility and integration.
01What does the BW 31 regulate?
The flow in the return line, depending on the fluid temperature.
02Which fluid is it for?
BW 31 for hot water and BW 31A for heating oil.
03Is the closing temperature adjustable?
Yes, it is factory-set and can be changed within the listed range, optionally with an external adjusting device.
04What is the maximum differential pressure?
6 bar. Please confirm against the manufacturer datasheet.
05What sizes are available?
DN 15, 20 and 25 at PN 40 / Class 150 and DN 40 at PN 25 / Class 150.


















Reviews
There are no reviews yet.