Brand:

Yokogawa ProSafe-SLS

Description

Overview

Yokogawa ProSafe-SLS comes from the world’s most experienced safety and control firm, with a commitment to reliable, state of the art safety instrumented systems rooted in installations since 1962. The solid-state, hard-wired ProSafe-SLS covers all requirements in the process industries.

The product line covers specific requirements for individual safety instrumented systems and offers all safety integrity levels (SIL 3-4) for the oil and gas, petrochemical, chemical, nuclear, and conventional power industries.

Engineering & Design

Safety-by-design is the foundation of the ProSafe-SLS: it was designed for applications that require the highest Safety Integrity Levels (SIL 3 and 4). It employs solid-state elements to process the functional logic, a technology capable of executing all typical safety tasks as well as the related supplementary non-safety-critical functions, including interfacing with a Human Machine Interface, Process Control System, Sequence of Event Recording system, and SCADA system.

A radical safety achievement is the elimination of software for an operating system and for self-diagnostics; instead, a unique inherent self-test technology is employed throughout all safety-related parts of the system. The ProSafe-SLS is fully integrated with the CENTUM VP process control system together with the ProSafe-RS safety system and FAST/TOOLS SCADA software package.

Key Features

  • Solid-state, hard-wired safety system
  • SIL 3 and SIL 4 capability
  • No operating system or software self-diagnostics
  • Unique inherent self-test technology
  • Safety-by-design architecture
  • Integrated with CENTUM VP and ProSafe-RS
  • FAST/TOOLS SCADA interface
  • Sequence of Event Recording interface
  • Proven since 1962 installations

Applications

  • Oil and gas safety systems
  • Petrochemical and chemical plants
  • Nuclear and conventional power
  • Emergency shutdown systems
  • High integrity safety functions

Specifications

Specification Value
Manufacturer Yokogawa
Model ProSafe-SLS
Type Solid-state, hard-wired SIS
Safety Integrity SIL 3-4
Logic Solid-state elements
Self-Test Inherent, no software
Integration CENTUM VP, ProSafe-RS, FAST/TOOLS
Interfaces HMI, PCS, SER, SCADA
Experience Installations since 1962

For high integrity safety, the Yokogawa ProSafe-SLS safety system is the proven platform, and Seven Star LLC supports the supply of the Yokogawa ProSafe-SLS safety system for your project.

The Yokogawa ProSafe-SLS is the safety instrumented system of the ProSafe family with the registered SIL 3 capability for the process shutdown functions. The system uses the stand-alone logic solver with the dedicated safety engineering environment and the FBD programming. The safety stations are configured in the redundant architecture and the I/O modules are connected to the field sensors and the final elements. The system is used for the emergency shutdown and the fire and gas logic of the plant.

The ProSafe-SLS units are installed in the 19-inch cabinets and the engineering is carried out with the ProSafe software. The system performs the self-diagnostics of the CPU and the I/O channels on the cyclic basis and reports the failures to the operator. The spare cards of the SLS system are matched to the station configuration of the plant.

The ProSafe-SLS system is engineered with the safety function block library and the proof test is supported by the integrated diagnostics. The system is certified for the SIL 3 applications with the TUV assessment and the installation follows the safety manual of the series. The redundant power input and the watchdog of the CPU increase the availability of the shutdown function. The spare modules are ordered with the exact revision of the installed station.

Why Seven Star LLC

Seven Star LLC supports the supply of Yokogawa ProSafe-SLS safety systems and spares for projects across the Gulf, with verified specifications and technical support. Our team assists with system evaluation and spare part planning for installed safety systems.

We serve oil and gas and power customers with reliable B2B supply of safety instrumented system hardware throughout the GCC.

Installation & Operation

The solid-state architecture executes the safety logic without an operating system, and the inherent self-test technology verifies the safety-related parts continuously. The system interfaces with the HMI, process control system, and SER for the plant integration.

The integration with CENTUM VP and ProSafe-RS provides the unified engineering environment, and the FAST/TOOLS SCADA interface completes the operational picture.

Identifying Installed ProSafe-SLS Hardware

Most ProSafe-SLS requirements today concern the support of existing installations, spare modules and system extensions. Because hard-wired safety systems are engineered per project, spare modules must match the installed hardware. Before requesting parts, collect the module type designation, the hardware revision and the serial number from each label, together with the cabinet and rack drawings and the system documentation reference. Our team uses this information to confirm that a replacement is interchangeable with the installed configuration.

  • Module type, hardware revision and serial number from the label
  • Cabinet, rack and slot position of the module
  • Project documentation number and plant tag references
  • Photographs of the front panel and connectors where labels are unclear

Modification and Commissioning Practice

Any modification to a safety instrumented system must follow the plant management of change procedure and the requirements of IEC 61511. Replacement modules should be installed by trained personnel following the safety manual, and the affected safety functions verified by a functional test before the system returns to service. Record the test results in the SIS maintenance records.

Maintenance and Lifecycle Planning

Solid-state safety systems usually give a long service life, but older installations need a planned spare parts strategy. Review the installed base, identify critical module types, and hold spares that match the installed revisions. Where components are approaching obsolescence, plan migration or life extension early, so that proof testing and operation of the Yokogawa ProSafe-SLS safety system are not interrupted by a shortage of parts.

Applications in Oman and the GCC

ProSafe-SLS systems are found in emergency shutdown, burner management and high integrity protection roles at oil and gas, petrochemical and power facilities, many of which have operated for many years in the region.

Also available: Yokogawa S9185FA Battery Pack

Request a Quote for Yokogawa-ProSafe-SLS

For the Yokogawa ProSafe-SLS safety system or any related control and instrumentation requirement, contact the Seven Star LLC team. Submit a formal inquiry through our RFQ page with your configuration and application details, and our specialists will respond with a detailed commercial proposal and the official Yokogawa documentation.

Related Products

Datasheets & Documents
  • PDF Datasheet Yokogawa-ProSafe-SLS Datasheet Download
Reviews (0)

Reviews

There are no reviews yet.

How would you rate this product?

It takes about 10 seconds — just tap a star. Your email is never published.

About brand

Yokogawa is the Japanese measurement and industrial automation company behind the DPharp EJA and EJX pressure transmitters, CENTUM distributed control systems and ProSafe-RS safety systems. Tamisuke Yokogawa set it up in 1915 as an electric meter research institute in Shibuya, Tokyo. It began selling electric meters in 1917, was incorporated as Yokogawa Electric Works in 1920, and has been Yokogawa Electric Corporation since 1986. In 1975 it released CENTUM, which it describes as the world's first distributed control system.

Seven Star LLC is an independent supplier in Muscat. We list Yokogawa transmitters, flowmeters, analysers, controllers, recorders and CENTUM and ProSafe spare modules, and supply them to oil and gas, power, water and process plants in Oman and the GCC by model code.

Yokogawa at a glance

Established 1915, Shibuya, Tokyo, by Tamisuke Yokogawa with Ichiro Yokogawa and Shin Aoki
Milestones Electric meters from 1917; incorporated in 1920; CENTUM DCS in 1975; renamed Yokogawa Electric Corporation in 1986
Headquarters Tokyo, Japan
Product families Pressure and temperature transmitters, magnetic, vortex and Coriolis flowmeters, liquid and gas analysers, controllers and recorders, CENTUM VP DCS, ProSafe-RS safety systems and STARDOM controllers

Yokogawa products we list

Family Models Typical use
Pressure and DP transmitters EJA110E, EJA430E, EJA530E, EJX110A, EJX530A, EJX910A multivariable Pressure, level and DP flow measurement in process plants
Temperature transmitters YTA610, YTA710 RTD and thermocouple signals converted to 4-20 mA, HART or fieldbus
Flowmeters ADMAG AXG, ADMAG AXW, ROTAMASS TI, VY vortex, VF701 Water and conductive liquids, mass flow of hydrocarbons, steam and gas
Analysers TDLS8000 laser gas analyser, FLXA402, FLXA21 DO, E7042UD zirconia cell, K9471DS cover Combustion O2, in-situ gas analysis, pH, conductivity and dissolved oxygen
Controllers and recorders UT35A/UT32A, UT32A-D, UT55A/UT52A, UT75A, UP35A/UP32A, UP55A, YS1700, GX10/GX20, GP10/GP20, GM10, µR20000 Single-loop control, furnace programs and data recording
Control and safety systems CP451-10 processor, ADV161, ADV551, node interface unit, ProSafe-RS, ProSafe-RS Lite, ProSafe-SLS, FCN-500 Spares and expansions for CENTUM DCS, safety systems and STARDOM
Battery packs S9129FA, S9185FA, S9548FA Memory backup batteries for DCS and controller modules

The EJA and EJX transmitters use Yokogawa's DPharp sensor: two silicon resonators whose vibration frequency changes with pressure, so the output is a digital frequency rather than an analogue strain signal. The model code describes the instrument completely. In EJA110E, "110" is a differential pressure transmitter, and the letters after the dash set the span, wetted materials, process connection, electrical output and approvals. When you replace a transmitter, sending the full code from the nameplate avoids a mismatch in range or materials.

Where Yokogawa products are used

In Oman and the GCC, Yokogawa transmitters, analysers and control systems are found in oil and gas production, gas processing and LNG, refineries and petrochemical plants, power and desalination stations, and water treatment. Many plants still run CENTUM CS 3000 and CENTUM VP systems that need spare I/O modules and batteries.

Ordering Yokogawa products: what we need

Send the full model and suffix code from the nameplate (for example EJA110E-JMS5J-912NN/KF22) and the style code. For DCS modules, add the module type and system version. For analysers, send the sensor type, measuring range and process conditions.

Facts checked against Yokogawa's corporate history, October 2026.

FAQ

Questions about the Yokogawa ProSafe-SLS

Answers from our engineering team on installation, compatibility and integration.

01What is the ProSafe-SLS?
It is a Yokogawa solid-state, hard-wired safety instrumented system covering SIL 3-4 for the process industries.
02How does it achieve safety?
Through safety-by-design with solid-state logic and inherent self-test technology, without an operating system or software self-diagnostics.
03Which industries use it?
Oil and gas, petrochemical, chemical, nuclear, and conventional power.
04Is it integrated with CENTUM VP?
Yes, it is fully integrated with CENTUM VP, ProSafe-RS, and FAST/TOOLS SCADA.
05What is its history?
Yokogawa safety installations date back to 1962, making it the most experienced safety and control firm.